The RGAM controllers have a standard, straightforward layout.

I can provide specific terminal numbers and step-by-step programming adjustments tailored to your rig. Share public link

Allows the operator to start and stop the engine manually.

Before installation, ensure your power supply and environment match the unit's requirements:

An event log storing the last 255 events (starts, stops, and alarms) with timestamps. ⚠️ Alarm Management

Built to withstand harsh industrial environments, high vibrations, and temperature fluctuations. 2. Technical Specifications

Dictates the threshold of reactive current needed to trigger a step. Reconnection Delay Time 30 to 60 seconds

: Real-time monitoring of status, alarm history viewing, and editing of setup parameters.

: Three-phase control, including asymmetry and single-phase checks (70–624VAC). Generator : Single-phase voltage and frequency control.

Use the navigation buttons to index past parameter addresses.