Harvey Hv3 Water Softener Installation Manual

The HV3 needs a drain line for the brine produced during regeneration. Connect the flexible drain hose to the overflow and brine drain ports on the softener. Direct the other end into a drain, standpipe, or gully, ensuring it is secure to avoid flooding, as it can move during high pressure. Step 6: Initial Set Up and Testing Double-check all connections.

A nearby drain is required for the regeneration waste water.

Connect the straight end of the hoses to your plumbing bypass valves and the angled ends to the softener unit. Ensure there are no sharp kinks or tight bends. 5. Hook Up the Drain and Overflow harvey hv3 water softener installation manual

The Harvey HV3 requires a three-valve bypass system. This allows you to isolate the water softener for maintenance or moving house without shutting off the main water supply to your entire home. The Three-Valve Bypass Configuration Controls hard water entering the softener.

While there is no specific single public manual exclusively for a " Harvey HV3 The HV3 needs a drain line for the

Before breaking into your plumbing line, ensure you have all the necessary components, tools, and site conditions ready. Included Components Harvey HV3 water softener unit High-flow bypass valve Two stainless steel braided hoses Drain line tubing (with air gap fitting) Overflow tubing Required Tools and Materials Pipe cutter (for copper or plastic pipes) Two adjustable wrenches PTFE (Teflon) thread tape Silicone lubricant (plumbing grade) Screwdriver (flathead and Phillips) Bucket and towels (for catching spills) Location Requirements The unit must sit on a solid, level floor.

Measure and mark the pipework where you will be inserting the bypass set. You will need to cut into your incoming mains water pipe and create a section that can accommodate the bypass valve. It's common practice to incorporate a hard water feed alongside the bypass set for a drinking water supply—some customers choose this option alongside their water softener. Step 6: Initial Set Up and Testing Double-check

Turn off the main stopcock and drain the pipes.